Planning resource

Advanced Air Mobility Site Readiness Checklist

An early site screening checklist for AAM infrastructure, vertiport feasibility and phased eVTOL investment.

Use this checklist to identify feasibility questions before commissioning detailed design. Record assumptions, who can verify them, and which investment decisions depend on the answers.

  1. Operating concept. Define missions, candidate aircraft, expected flights per day and passenger or cargo volume and who would operate the site.
  2. Airspace and ground layout. Identify nearby aviation activity, obstructions, available land and emergency access. Confirm which reviews and design references apply.
  3. Utility capacity. Estimate charging or fueling needs for the initial operating concept. Confirm utility lead times, communications and space for equipment.
  4. Surface access. Map ground vehicle and pedestrian movement, passenger or cargo handling, and maintenance access.
  5. Stakeholder dependencies. Identify property, airport, utility, local planning and emergency response stakeholders. Record unresolved community and operating questions.
  6. Expansion triggers. Record the demand, utility capacity, or aircraft information that would justify the next phase. Separate early site studies from construction commitments.

Example decision

For an industrial campus screening two sites, establish which site can support emergency access and the initial utility load. Defer sizing for a later phase until the operating concept and aircraft assumptions are better defined.

Prepared by Alert Five Productions. See AAM consulting and the FAA’s AAM infrastructure guidance.